You Searched for

We’ve found 1300 results
  • Benban

    The Benban Solar Power Plant in Egypt has a total combined capacity of 1.8GW.

  • Green Barbuda project

    Masdar has implemented a hurricane-resistant clean energy plant in Antigua and Barbuda that contributes to Antigua and Barbuda's goal of producing 15 percent of its electricity needs from renewable sources by 2030. The project includes an 800kW diesel power plant and a 720kWh hybrid solar power plant, as well as an 863kWh battery system to store excess electricity generated.

  • West Bakr

    Lekela’s West Bakr Wind project in the Gulf of Suez takes advantage of a world class wind resource to produce 252MW of clean, reliable power at a highly competitive price.

  • Vanuatu Port Vila 767kW Solar PV

    Port Vila, the capital city of the island state of Vanuatu, has a population of 44,000, of which only 27% have access to electricity

  • Siwa Solar PV Plant

    Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.

  • Samoa Wind Farm

    The innovative project supploes 1,500 megawatt-hours of power per year, delivering $475,000 (U.S.) in annual fuel savings

  • 7000 Solar Home Systems

    Masdar has helped bring electricity to nearly 7,000 homes and other community buildings in remote areas of Al Wadi Al Jadeed, Aswan, Luxor, Matruh, Qena and Sohag governorates of Egypt. 

  • Toshka

    The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company

  • Mauritania Rural Electrification Programme

    Masdar installed 16.6MW of photovoltaic (PV) projects across eight remote communities in Mauritania. Inaugurated in November 2016, the 16.6MW PV rural electrification programme was funded by the governments of Mauritania and Abu Dhabi.

  • Taiba BESS

    The key applications of the project are grid stabilization, frequency regulation and reactive power support.

  • Khobab

    The Khobab Wind Farm was contracted under the South African Government’s Round 3 Renewable Energy Independent Power Producer Procurement Programme, achieving commercial operation in December 2017.

  • Desert Harvest 1 and Desert Harvest 2 PV projects

    The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.

  • Belize 400kW Solar PV Battery

    With 400kW of solar photovoltaic panels, 600kWh of battery storage, and 184kW backup diesel generation, the system will mainly be powered by solar energy, with a standby diesel generator to provide power during the wet season.

  • Baltic Eagle Offshore Wind Farm

    Baltic Eagle is a joint venture project between Masdar and Iberdrola, involving the construction of a 476 MW offshore wind farm located near Rügen Island in the Baltic Sea.

  • Afghanistan Solar Home Systems

    Masdar installed solar home systems in more than two dozen villages around Camp Robinson within the Helmand Province of southern Afghanistan.

  • Nur-Bukhara PV

    In April 2023, Masdar signed a Power Purchase Agreement (PPA) and Government Support Agreement (GSA) with the government of the Republic of Uzbekistan to design, finance, build and operate the Nur Bukhara 250MW solar and 63MW/126MWh battery storage project.

  • Dudgeon Extension

    Located 27 kilometres off the coast of North Norfolk in East Anglia within water depths of between 18 and 25 metres, the Dudgeon Extension Offshore Wind Farm is one of Masdar's latest investments in the United Kingdom’s renewable energy sector.

  • Code of Ethics and Business Conduct

    Our Code of Ethics & Business Conduct (Code) is the essential guide that defines what we stand for and how we work. It emphasizes that we must keep integrity at the heart of everything we do.

  • Fraud Warning

    Abu Dhabi Future Energy Company PJSC – Masdar (“Masdar”), is advising that it has become aware of a notable increase in fraudulent emails, letters, social media posts, and messages via online messaging services, being sent to members of the public.

  • Our Company

    Masdar develops utility-scale power plants, community grid projects, and energy storage, efficiency-focused systems, and technology demonstration projects.