Commercial and Industrial Projects

Industry forms the lifeblood of our economies. Masdar has been working hard to support the commercial and industrial sector to meet decarbonization goals. Emerge, our joint venture with EDF renewables, has been spearheading innovative rooftop solar projects throughout the UAE and in neighboring countries in support of net-zero goals.

For example, Emerge has installed a 7 MWp rooftop solar project at Warner Bros. World theme park in Abu Dhabi, which will meet nearly 40 percent of the park’s annual energy demand. Similar projects are underway at the Coca-Cola Al Ahlia Beverages’ Al Ain bottling facility and Khazna Data Centers in Masdar City, Abu Dhabi.

In Indonesia, we are targeting the C&I market with our PT Masdar Mitra Solar Radiance joint venture. Operating under the Solar Radiance brand, the joint venture with PT Mitrabara Adiperdana Tbk will help Masdar further expand its presence in Indonesia and support the nation’s clean energy and climate objectives.

With Indonesia targeting at least 51 percent of added power capacity from renewable sources by 2030, the C&I segment is expected to enjoy very rapid growth.

The plant, which has obtained Abu Dhabi’s Department of Energy Solar Photovoltaic (PV) self-regulating generation license, will have an installed capacity of 7 MWp and will provide electricity to the Khazna Abu Dhabi 6 (AUH 6) facility.

Khazna Data Center Photovoltaic Plant

Capacity:

7MW

Solar PV | United Arab Emirates

The Warner Bros. World Abu Dhabi solar rooftop PV project includes an estimated 16,000 solar modules placed across the theme park’s roof area of 36,000 square meters.

Warner Bros. World Abu Dhabi

Capacity:

7MWp

Solar PV | United Arab Emirates

Emerge is providing a full turnkey solution for 1.2 megawatt peak rooftop solar PV project, including design, procurement and construction, and operation and maintenance. The solar PV system will be installed on Al Dahra’s rice processing facility located in KEZAD.

Al Dahra Rooftop Solar Project

Capacity :

1.2MW

Solar PV | United Arab Emirates

The project will have a capacity of 8.2MW with rooftop solar PV systems installed at the marine-life mega development on Yas Island, including the main building.

SeaWorld Solar project

Total capacity:

8.2MW

Solar PV | United Arab Emirates

The 3 MW solar photovoltaic project is installed on the car shading at the short-term car park of the Midfield Terminal at Abu Dhabi International Airport.

Midfield Terminal Solar Car Park

Capacity:

3MW

Solar PV | United Arab Emirates

Emerge is developing a solar photovoltaic (PV) plant for Coca-Cola Al Ahlia Beverages, Coca-Cola’s bottler and distributor in the UAE, to develop a 1.8-megawatt (MWp) solar photovoltaic (PV) plant for its Al Ain facility.

Coca-Cola Al Ahlia Beverages Solar Project

Solar PV | United Arab Emirates

Turnkey solar power solutions at service stations in Dubai

ADNOC Distribution Dubai Rooftop PV Project

Developing on-site solar power across

ADNOC Distribution’s service station network

Solar PV | United Arab Emirates