You Searched for
-
Cirata Floating Photovoltaic FPV Plant
In January 2020, Masdar signed a power purchase agreement (PPA) with PT PLN Nusantara Renewables, a subsidiary of PT Perusahaan Listrik Negara (Persero) (PLN), the state-owned electricity company in Indonesia. The agreement was to build Southeast Asia’s largest floating solar power plant.
-
Cibuk 1
The Cibuk 1 wind farm is a utility-scale onshore wind farm located in Vojvodina province, Serbia. The project provides clean, reliable and economically viable electricity to around 113,000 Serbian homes.
-
Dudgeon Offshore Wind Farm
Located 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector.
-
Barbados Caribbean Renewable Energy Fund
350 kW solar PV carport with EV charger stations + 500 kW solar PV ground mount
-
Tafila Wind Farm
The Tafila Wind Farm is the first commercial utility-scale wind power project in the Middle East. Located in the Hashemite Kingdom of Jordan, the 117 megawatt wind farm has increased the country’s total power capacity by 3 per cent.
-
Royle Barn Road Rochdale
The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.
-
Bilasuvar Solar Power Plant
The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Neftchala Solar Power Plant
The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Kangnas
Situated approximately 52km east of the town of Springbok in the Nama Khoi Local Municipality of the Northern Cape
-
Benban
The Benban Solar Power Plant in Egypt has a total combined capacity of 1.8GW.
-
Green Barbuda project
Masdar has implemented a hurricane-resistant clean energy plant in Antigua and Barbuda that contributes to Antigua and Barbuda's goal of producing 15 percent of its electricity needs from renewable sources by 2030. The project includes an 800kW diesel power plant and a 720kWh hybrid solar power plant, as well as an 863kWh battery system to store excess electricity generated.
-
Suriname Solar-PV Hybrid
This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.
-
Siwa Solar PV Plant
Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.
-
Perderkraal East
Perdekraal East is a 110 MW wind farm located approximately 30km north of Touwsriver in Western Cape, South Africa.
-
Maverick 1 and Maverick 4 PV projects
The project comprises of two solar PV plants with a total capacity of 311 MW located in Riverside County, California. Together, the projects feature 780 thousand Bifacial Canadian Solar panels with SMA inverters on NexTracker single axis trackers upgraded with TrueCapture Software, guaranteed to increase project output.
-
Las Majadas Onshore Wind Farm
Located in Willacy County, Texas, this 273 MW project is part of the 1.6 GW clean energy portfolio Masdar acquired in partnership with EDF Renewables.
-
Khobab
The Khobab Wind Farm was contracted under the South African Government’s Round 3 Renewable Energy Independent Power Producer Procurement Programme, achieving commercial operation in December 2017.
-
Coyote Onshore Wind Farm
The 243 MW Coyote wind project is part of Masdar’s second strategic EDF investment in Scurry County, Texas and features (48) 4.5 MW and (11) 2.4 MW Siemens Gamesa turbines.
-
Big Beau
Big Beau is a 164 MWdc solar PV and 40 MW/160 MWh battery energy-storage system. Located in Kern County, California. The project features more than 443 thousand Bifacial Canadian Solar panels with power electronics inverters on ATI trackers.
-
Sterling Wind Farm
The 29.9MW Sterling project in Lea County, New Mexico was commissioned in 2017 and is comprised of 13 GE 2.3MW turbines.