You Searched for

We’ve found 1314 results
  • Tafila Wind Farm

    The Tafila Wind Farm is the first commercial utility-scale wind power project in the Middle East. Located in the Hashemite Kingdom of Jordan, the 117 megawatt wind farm has increased the country’s total power capacity by 3 per cent.

  • Bilasuvar Solar Power Plant

    The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.

  • Kangnas

    Situated approximately 52km east of the town of Springbok in the Nama Khoi Local Municipality of the Northern Cape

  • Benban

    The Benban Solar Power Plant in Egypt has a total combined capacity of 1.8GW.

  • Green Barbuda project

    Masdar has implemented a hurricane-resistant clean energy plant in Antigua and Barbuda that contributes to Antigua and Barbuda's goal of producing 15 percent of its electricity needs from renewable sources by 2030. The project includes an 800kW diesel power plant and a 720kWh hybrid solar power plant, as well as an 863kWh battery system to store excess electricity generated.

  • West Bakr

    Lekela’s West Bakr Wind project in the Gulf of Suez takes advantage of a world class wind resource to produce 252MW of clean, reliable power at a highly competitive price.

  • Suriname Solar-PV Hybrid

    This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.

  • Siwa Solar PV Plant

    Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.

  • 7000 Solar Home Systems

    Masdar has helped bring electricity to nearly 7,000 homes and other community buildings in remote areas of Al Wadi Al Jadeed, Aswan, Luxor, Matruh, Qena and Sohag governorates of Egypt. 

  • Nauru Solar

    The Republic of Nauru is an island of just 21 square kilometres with more than 9,500 citizens that is highly dependent on imported fossil fuels for transport and power generation

  • Toshka

    The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company

  • Mauritania Rural Electrification Programme

    Masdar installed 16.6MW of photovoltaic (PV) projects across eight remote communities in Mauritania. Inaugurated in November 2016, the 16.6MW PV rural electrification programme was funded by the governments of Mauritania and Abu Dhabi.

  • Perderkraal East

    Perdekraal East is a 110 MW wind farm located approximately 30km north of Touwsriver in Western Cape, South Africa.

  • Las Majadas Onshore Wind Farm

    Located in Willacy County, Texas, this 273 MW project is part of the 1.6 GW clean energy portfolio Masdar acquired in partnership with EDF Renewables.

  • Khobab

    The Khobab Wind Farm was contracted under the South African Government’s Round 3 Renewable Energy Independent Power Producer Procurement Programme, achieving commercial operation in December 2017.

  • Desert Harvest 1 and Desert Harvest 2 PV projects

    The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.

  • Afghanistan Solar Home Systems

    Masdar installed solar home systems in more than two dozen villages around Camp Robinson within the Helmand Province of southern Afghanistan.

  • Jambyl 1GW Wind Farm 600MWh BESS

    Located in the Jambyl region, this 1GW wind farm with a 600-megawatt-hour (MWh) BESS is Masdar’s inaugural project in Kazakhstan and one of the largest in Central Asia.

  • Code of Ethics and Business Conduct

    Our Code of Ethics & Business Conduct (Code) is the essential guide that defines what we stand for and how we work. It emphasizes that we must keep integrity at the heart of everything we do.

  • Fraud Warning

    Abu Dhabi Future Energy Company PJSC – Masdar (“Masdar”), is advising that it has become aware of a notable increase in fraudulent emails, letters, social media posts, and messages via online messaging services, being sent to members of the public.