You Searched for
-
Sherabad Solar Project
In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.
-
Kangnas
Situated approximately 52km east of the town of Springbok in the Nama Khoi Local Municipality of the Northern Cape
-
Benban
The Benban Solar Power Plant in Egypt has a total combined capacity of 1.8GW.
-
Vanuatu Port Vila 767kW Solar PV
Port Vila, the capital city of the island state of Vanuatu, has a population of 44,000, of which only 27% have access to electricity
-
7000 Solar Home Systems
Masdar has helped bring electricity to nearly 7,000 homes and other community buildings in remote areas of Al Wadi Al Jadeed, Aswan, Luxor, Matruh, Qena and Sohag governorates of Egypt.
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company
-
Mauritania Rural Electrification Programme
Masdar installed 16.6MW of photovoltaic (PV) projects across eight remote communities in Mauritania. Inaugurated in November 2016, the 16.6MW PV rural electrification programme was funded by the governments of Mauritania and Abu Dhabi.
-
Taiba BESS
The key applications of the project are grid stabilization, frequency regulation and reactive power support.
-
Perderkraal East
Perdekraal East is a 110 MW wind farm located approximately 30km north of Touwsriver in Western Cape, South Africa.
-
Khobab
The Khobab Wind Farm was contracted under the South African Government’s Round 3 Renewable Energy Independent Power Producer Procurement Programme, achieving commercial operation in December 2017.
-
Desert Harvest 1 and Desert Harvest 2 PV projects
The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.
-
Big Beau
Big Beau is a 164 MWdc solar PV and 40 MW/160 MWh battery energy-storage system. Located in Kern County, California. The project features more than 443 thousand Bifacial Canadian Solar panels with power electronics inverters on ATI trackers.
-
Belize 400kW Solar PV Battery
With 400kW of solar photovoltaic panels, 600kWh of battery storage, and 184kW backup diesel generation, the system will mainly be powered by solar energy, with a standby diesel generator to provide power during the wet season.
-
Baltic Eagle Offshore Wind Farm
Baltic Eagle is a joint venture project between Masdar and Iberdrola, involving the construction of a 476 MW offshore wind farm located near Rügen Island in the Baltic Sea.
-
Nur-Bukhara PV
In April 2023, Masdar signed a Power Purchase Agreement (PPA) and Government Support Agreement (GSA) with the government of the Republic of Uzbekistan to design, finance, build and operate the Nur Bukhara 250MW solar and 63MW/126MWh battery storage project.
-
Dudgeon Extension
Located 27 kilometres off the coast of North Norfolk in East Anglia within water depths of between 18 and 25 metres, the Dudgeon Extension Offshore Wind Farm is one of Masdar's latest investments in the United Kingdom’s renewable energy sector.
-
Fraud Warning
Abu Dhabi Future Energy Company PJSC – Masdar (“Masdar”), is advising that it has become aware of a notable increase in fraudulent emails, letters, social media posts, and messages via online messaging services, being sent to members of the public.
-
History and Legacy
Deploying renewable energy projects and realising low-carbon urban development
-
masdaratcop29
Masdar at COP29: Pioneering renewable energy to the world
-
masdaratcop28
Masdar at COP28: Pioneering renewable energy to the world