You Searched for
-
Winners of ADSW Artwork Competition Receive Prizes
Masdar, Abu Dhabi’s renewable energy company, today awarded iPhones and iPad minis to five students who won the Abu Dhabi Sustainability Week Artwork Competition.
Published on: 27 JAN 2013
-
SAGIA Initiates Investment License Process for Saudi Wind Project
The Saudi Arabian General Investment Authority (SAGIA) announced today that it has initiated the process to give an investment license to the consortium of Abu Dhabi Future Energy Company – Masdar and EDF Renewables which last week was awarded the Kingdom’s first utility scale wind project at Dumat Al Jandal.
Published on: 15 JAN 2019
-
Arab Women’s Role in Energy and Climate Change Highlighted on Sidelines of World Economic Forum in t
The high-level majlis titled “Arab women leading the way in energy and climate change” was jointly hosted by the Directorate of Energy and Climate Change at the UAE Ministry of Foreign Affairs, the Mary Robinson Foundation - Climate Justice and Masdar, Abu Dhabi’s renewable energy company.
Published on: 12 NOV 2012
-
Masdar And Terna Energy
-
World Future Energy Summit
Masdar to host the second annual Green Hydrogen Summit, as part of the World Future Energy Summit, aims to accelerate the development of the global green hydrogen economy to support the energy transition.
-
Report Details
Masdar reports on sustainability targets and publish reports on trends that matter most in the sustainability sector
-
Energy storage
Masdar is committed to developing and deploying energy storage solutions to create a more flexible grid system.
-
DBS Dogger Bank South
Located 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector.
-
Guzar
Masdar has entered into a Public Private Partnership Agreement to design, build and operate a 300MW solar photovoltaic power plant and 75MWh capacity battery energy storage system in the Kashkadarya Region in the Republic of Uzbekistan. Financial close was reached during Abu Dhabi Sustainability Week 2026.
-
Garadagh Area 60 Solar Photovoltaic Power Plant
The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.
-
Krnovo Wind Farm
The 72-megawatt (MW) onshore wind farm is Montenegro’s first wind farm and one of the largest in the region.
-
Kiribati 500kW Solar PV Water Protection
The UAE-PPF project is helping to meet the needs of 17% of Kiribati’s population who live off-grid
-
Fiji LaKaRo 525kW Solar PV
Inhabitants on three of Fiji’s outer islands (Kadevu, Lakeba, and Rotuma) have access to energy around the clock having previously had power for only 12-18 hours a day
-
Cibuk 1
The Cibuk 1 wind farm is a utility-scale onshore wind farm located in Vojvodina province, Serbia. The project provides clean, reliable and economically viable electricity to around 113,000 Serbian homes.
-
Dudgeon Offshore Wind Farm
Located 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector.
-
The Sheikh Zayed Solar Power Plant
The Sheikh Zayed Solar Power Plant is a 15-megawatt photovoltaic facility in Nouakchott, the capital of the Islamic Republic of Mauritania. It was one of the largest solar power installations in Africa when completed and is the first such utility-scale installation in the country.
-
Tuvalu Rooftop Solar PV
Built on a 4-metre high structure, the UAE-PPF project in Tuvalu creates shaded public space while feeding clean energy into the grid
-
Solomon Islands Solar PV Plant
The one megawatt plant, which was expanded from 600kW following a grant from the New Zealand Ministry of Foreign Affairs and Trade, bolster energy resilience and reduce costs associated with diesel imports
-
Tafila Wind Farm
The Tafila Wind Farm is the first commercial utility-scale wind power project in the Middle East. Located in the Hashemite Kingdom of Jordan, the 117 megawatt wind farm has increased the country’s total power capacity by 3 per cent.
-
Welkin Road Stockport
The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.