You Searched for

We’ve found 1315 results
  • Concentrated Solar Power

    Concentrated Solar Power (CSP) systems are considered a promising technology for large-scale power generation. Masdar has invested in and developed several different types of CSP projects.

  • Waste-to-Energy

    With the development of waste-to-energy projects, Masdar is helping to tackle the issue of waste management.

  • Offshore Wind

    Towering above the waves, offshore wind turbines capture high wind speeds to deliver clean energy.

  • Pertamina Geothermal Energy

    Masdar entered the geothermal market in February 2023 by investing in one of the world’s largest geothermal players, Pertamina Geothermal Energy. The geothermal plants generate 4.8TWh geothermal energy with 3,915,000 tons of carbnon dioxide avoided each year.

  • Guzar

    Masdar has entered into a Public Private Partnership Agreement to design, build and operate a 300MW solar photovoltaic power plant and 75MWh capacity battery energy storage system in the Kashkadarya Region in the Republic of Uzbekistan. Financial close was reached during Abu Dhabi Sustainability Week 2026.

  • Garadagh Area 60 Solar Photovoltaic Power Plant

    The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.

  • 100 MW Nur Navoi Solar Project

    In November 2019, Masdar signed a Power Purchase Agreement (PPA) and Government Support Agreement (GSA) with the Government of the Republic of Uzbekistan to design, finance, build and operate the country’s first public-private partnership (PPP) solar power plant.

  • Jizzakh Solar Project

    In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan

  • Kiribati 500kW Solar PV Water Protection

    The UAE-PPF project is helping to meet the needs of 17% of Kiribati’s population who live off-grid

  • FSM Solar in Pohnpei

    This project features solar PV systems on 11 government buildings. With a total installed capacity of 2.3MWp, it reduces annual diesel fuel consumption by 1.22 million liters and mitigates 3,220 tonnes of CO2 emissions annually.

  • Fiji LaKaRo 525kW Solar PV

    Inhabitants on three of Fiji’s outer islands (Kadevu, Lakeba, and Rotuma) have access to energy around the clock having previously had power for only 12-18 hours a day

  • Tuvalu Rooftop Solar PV

    Built on a 4-metre high structure, the UAE-PPF project in Tuvalu creates shaded public space while feeding clean energy into the grid

  • Bilasuvar Solar Power Plant

    The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.

  • Neftchala Solar Power Plant

    The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.

  • Sherabad Solar Project

    In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.

  • Suriname Solar-PV Hybrid

    This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.

  • Siwa Solar PV Plant

    Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.

  • 7000 Solar Home Systems

    Masdar has helped bring electricity to nearly 7,000 homes and other community buildings in remote areas of Al Wadi Al Jadeed, Aswan, Luxor, Matruh, Qena and Sohag governorates of Egypt. 

  • Toshka

    The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company

  • Mauritania Rural Electrification Programme

    Masdar installed 16.6MW of photovoltaic (PV) projects across eight remote communities in Mauritania. Inaugurated in November 2016, the 16.6MW PV rural electrification programme was funded by the governments of Mauritania and Abu Dhabi.