You Searched for
- 
                                Dhofar Wind ProjectThe 50-megawatt project will be the first large-scale wind farm in the GCC region. 
- 
                                Caribbean Renewable Energy Fund Saint Vincent and the Grenadines600kW solar PV plant + 600kWh lithium-ion battery 
- 
                                BaynounaLocated east of Amman, Baynouna is the largest single solar energy project currently under development in Jordan 
- 
                                Ile de Romainville Solar ParkRomainville Solar Park is a 5-megawatt (MW) solar photovoltaic (PV) power plant with battery storage in the Re¬public of Seychelles. 
- 
                                Dudgeon Offshore Wind FarmLocated 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector. 
- 
                                The Sheikh Zayed Solar Power PlantThe Sheikh Zayed Solar Power Plant is a 15-megawatt photovoltaic facility in Nouakchott, the capital of the Islamic Republic of Mauritania. It was one of the largest solar power installations in Africa when completed and is the first such utility-scale installation in the country. 
- 
                                Barbados Caribbean Renewable Energy Fund350 kW solar PV carport with EV charger stations + 500 kW solar PV ground mount 
- 
                                Tuvalu 500kW Rooftop Solar PVBuilt on a 4-metre high structure, the UAE-PPF project in Tuvalu creates shaded public space while feeding clean energy into the grid 
- 
                                Tafila Wind FarmThe Tafila Wind Farm is the first commercial utility-scale wind power project in the Middle East. Located in the Hashemite Kingdom of Jordan, the 117 megawatt wind farm has increased the country’s total power capacity by 3 per cent. 
- 
                                Masdar City 1 MW rooftop solar PVMasdar City uses clean energy generated on site from both the 10MW solar power plant and 1MW rooftop solar panels installed on the Mohamed bin Zayed University of Artificial Intelligence campus buildings, which supply the national grid. 
- 
                                Loeriesfontein 2Loeriesfontein 2 is situated in the Hantam Municipality of South Africa’s Northern Cape and was contracted under the third round of the country’s Renewable Energy Independent Power Producer Procurement Programme. 
- 
                                Khazna Data Center Photovoltaic PlantThe plant, which has obtained Abu Dhabi’s Department of Energy Solar Photovoltaic (PV) self-regulating generation license, will have an installed capacity of 7 MWp and will provide electricity to the Khazna Abu Dhabi 6 (AUH 6) facility. 
- 
                                KangnasSituated approximately 52km east of the town of Springbok in the Nama Khoi Local Municipality of the Northern Cape 
- 
                                Crown Prince Headquarters Solar Rooftop ProjectThis project added capacity to the Crown Prince Court Headquarters through the installation of additional solar rooftop PV modules, following an initial project in 2010. 
- 
                                BenbanThe Benban Solar Power Plant in Egypt has a total combined capacity of 1.8GW. 
- 
                                Abu Dhabi Fund for Development HQThis landmark energy and water-saving project at the Abu Dhabi Fund for Development HQ building involved the installation of an advanced chiller plant manager, variable frequency drives (VFDs) on the ventilation system, an advanced ventilation and air-conditioning control system 
- 
                                West BakrLekela’s West Bakr Wind project in the Gulf of Suez takes advantage of a world class wind resource to produce 252MW of clean, reliable power at a highly competitive price. 
- 
                                Warner Bros World Abu DhabiThe Warner Bros. World Abu Dhabi solar rooftop PV project includes an estimated 16,000 solar modules placed across the theme park’s roof area of 36,000 square meters. 
- 
                                TaibaThe 158.7MW Parc Eolien Taiba N’Diaye (PETN) provides a 15% increase in electricity generation capacity for the country and power for over 2 million people. 
- 
                                Al Dahra Rooftop Solar ProjectEmerge is providing a full turnkey solution for 1.2 megawatt peak rooftop solar PV project, including design, procurement and construction, and operation and maintenance. The solar PV system will be installed on Al Dahra’s rice processing facility located in KEZAD.