You Searched for
-
Jizzakh Solar Project
In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan
-
Solomon Islands Solar PV Plant
The one megawatt plant, which was expanded from 600kW following a grant from the New Zealand Ministry of Foreign Affairs and Trade, bolster energy resilience and reduce costs associated with diesel imports
-
Welkin Road Stockport
The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.
-
Royle Barn Road Rochdale
The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.
-
Bilasuvar Solar Power Plant
The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Neftchala Solar Power Plant
The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Sherabad Solar Project
In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.
-
Green Barbuda project
Masdar has implemented a hurricane-resistant clean energy plant in Antigua and Barbuda that contributes to Antigua and Barbuda's goal of producing 15 percent of its electricity needs from renewable sources by 2030. The project includes an 800kW diesel power plant and a 720kWh hybrid solar power plant, as well as an 863kWh battery system to store excess electricity generated.
-
West Bakr
Lekela’s West Bakr Wind project in the Gulf of Suez takes advantage of a world class wind resource to produce 252MW of clean, reliable power at a highly competitive price.
-
Taiba
The 158.7MW Parc Eolien Taiba N’Diaye (PETN) provides power for over 2 million people.
-
Siwa Solar PV Plant
Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.
-
Samoa Wind Farm
The innovative project supploes 1,500 megawatt-hours of power per year, delivering $475,000 (U.S.) in annual fuel savings
-
Nauru Solar
The Republic of Nauru is an island of just 21 square kilometres with more than 9,500 citizens that is highly dependent on imported fossil fuels for transport and power generation
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company
-
Desert Harvest 1 and Desert Harvest 2 PV projects
The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.
-
Big Beau
Big Beau is a 164 MWdc solar PV and 40 MW/160 MWh battery energy-storage system. Located in Kern County, California. The project features more than 443 thousand Bifacial Canadian Solar panels with power electronics inverters on ATI trackers.
-
Noupoort
Noupoort Wind Farm successfully reached commercial operations on schedule and on budget in July 2016
-
Jambyl 1GW Wind Farm 600MWh BESS
Located in the Jambyl region, this 1GW wind farm with a 600-megawatt-hour (MWh) BESS is Masdar’s inaugural project in Kazakhstan and one of the largest in Central Asia.
-
Privacy Policy
Abu Dhabi Future Energy Company PJSC - Masdar (“Masdar”, “us” or “we”) acknowledges and respects your right to privacy and is committed to protecting and safeguarding your data that we use in compliance with applicable data protection laws.
-
Modern Day Slavery Statement
Masdar continually works to prevent slavery and human trafficking from taking place in our manufacturing supply chains and operations, in line with the United Kingdom Modern Slavery Act.