You Searched for
-
Masdar and Masdar Institute Launch UAE’s First Independent Solar Testing and R&D Hub
Abu Dhabi, UAE, April 22, 2015 – Masdar, Abu Dhabi’s pioneering renewable energy company, and the Masdar Institute of Science and Technology, today announced plans to launch the Masdar Solar Hub to expedite the development of solar technologies. The new hub aims to support Abu Dhabi’s efforts to achieve its ambitions for solar energy development and deployment through research and demonstration of cutting-edge solar photovoltaic, solar thermal and thermal energy storage technologies.
Published on: 21 APR 2015
-
Renewable Energy Cost Competitive with Other Sources
Renewable energy has achieved unprecedented acceptance as a cost competitive technology of choice and is no longer an expensive alternative to traditional sources, according to Dr Ahmad Belhoul, CEO of Masdar, Abu Dhabi’s renewable energy company.
Published on: 13 APR 2015
-
Arab Women’s Role in Energy and Climate Change Highlighted on Sidelines of World Economic Forum in t
The high-level majlis titled “Arab women leading the way in energy and climate change” was jointly hosted by the Directorate of Energy and Climate Change at the UAE Ministry of Foreign Affairs, the Mary Robinson Foundation - Climate Justice and Masdar, Abu Dhabi’s renewable energy company.
Published on: 12 NOV 2012
-
Renewables
We are active in solar, wind, waste-to-energy, geothermal, energy storage and green hydrogen projects across the world with a generation capacity of over 20 gigawatts, equivalent to displacing 30 million tonnes of carbon dioxide per year.
-
Floating Photovoltaic Solar Power
Locating solar power plants on water is an innovative alternative for countries seeking to harness the power of the sun.
-
Waste-to-Energy
With the development of waste-to-energy projects, Masdar is helping to tackle the issue of waste management.
-
DBS Dogger Bank South
Located 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector.
-
Guzar
Masdar has entered into a Public Private Partnership Agreement to design, build and operate a 300MW solar photovoltaic power plant and 75MWh capacity battery energy storage system in the Kashkadarya Region in the Republic of Uzbekistan. Financial close was reached during Abu Dhabi Sustainability Week 2026.
-
Jizzakh Solar Project
In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan
-
Hywind Scotland
Hywind is the world’s first floating offshore windfarm, located off the coast of Aberdeenshire in Scotland. Masdar has a 25 per cent stake in the 30MW project, along with lead operator Equinor, which owns 75 per cent.
-
Cibuk 1
The Cibuk 1 wind farm is a utility-scale onshore wind farm located in Vojvodina province, Serbia. The project provides clean, reliable and economically viable electricity to around 113,000 Serbian homes.
-
The Sheikh Zayed Solar Power Plant
The Sheikh Zayed Solar Power Plant is a 15-megawatt photovoltaic facility in Nouakchott, the capital of the Islamic Republic of Mauritania. It was one of the largest solar power installations in Africa when completed and is the first such utility-scale installation in the country.
-
Tafila Wind Farm
The Tafila Wind Farm is the first commercial utility-scale wind power project in the Middle East. Located in the Hashemite Kingdom of Jordan, the 117 megawatt wind farm has increased the country’s total power capacity by 3 per cent.
-
Welkin Road Stockport
The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.
-
Royle Barn Road Rochdale
The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.
-
Green Barbuda project
Masdar has implemented a hurricane-resistant clean energy plant in Antigua and Barbuda that contributes to Antigua and Barbuda's goal of producing 15 percent of its electricity needs from renewable sources by 2030. The project includes an 800kW diesel power plant and a 720kWh hybrid solar power plant, as well as an 863kWh battery system to store excess electricity generated.
-
Suriname Solar-PV Hybrid
This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.
-
7000 Solar Home Systems
Masdar has helped bring electricity to nearly 7,000 homes and other community buildings in remote areas of Al Wadi Al Jadeed, Aswan, Luxor, Matruh, Qena and Sohag governorates of Egypt.
-
Nauru Solar
The Republic of Nauru is an island of just 21 square kilometres with more than 9,500 citizens that is highly dependent on imported fossil fuels for transport and power generation
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company