You Searched for
-
Welkin Road Stockport
The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.
-
Royle Barn Road Rochdale
The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.
-
Bilasuvar Solar Power Plant
The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Neftchala Solar Power Plant
The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Sherabad Solar Project
In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.
-
Loeriesfontein 2
Loeriesfontein 2 is situated in the Hantam Municipality of South Africa’s Northern Cape and was contracted under the third round of the country’s Renewable Energy Independent Power Producer Procurement Programme.
-
Kangnas
Situated approximately 52km east of the town of Springbok in the Nama Khoi Local Municipality of the Northern Cape
-
Benban
The Benban Solar Power Plant in Egypt has a total combined capacity of 1.8GW.
-
Green Barbuda project
Masdar has implemented a hurricane-resistant clean energy plant in Antigua and Barbuda that contributes to Antigua and Barbuda's goal of producing 15 percent of its electricity needs from renewable sources by 2030. The project includes an 800kW diesel power plant and a 720kWh hybrid solar power plant, as well as an 863kWh battery system to store excess electricity generated.
-
West Bakr
Lekela’s West Bakr Wind project in the Gulf of Suez takes advantage of a world class wind resource to produce 252MW of clean, reliable power at a highly competitive price.
-
Suriname Solar-PV Hybrid
This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.
-
Siwa Solar PV Plant
Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.
-
7000 Solar Home Systems
Masdar has helped bring electricity to nearly 7,000 homes and other community buildings in remote areas of Al Wadi Al Jadeed, Aswan, Luxor, Matruh, Qena and Sohag governorates of Egypt.
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company
-
Perderkraal East
Perdekraal East is a 110 MW wind farm located approximately 30km north of Touwsriver in Western Cape, South Africa.
-
Maverick 1 and Maverick 4 PV projects
The project comprises of two solar PV plants with a total capacity of 311 MW located in Riverside County, California. Together, the projects feature 780 thousand Bifacial Canadian Solar panels with SMA inverters on NexTracker single axis trackers upgraded with TrueCapture Software, guaranteed to increase project output.
-
Las Majadas Onshore Wind Farm
Located in Willacy County, Texas, this 273 MW project is part of the 1.6 GW clean energy portfolio Masdar acquired in partnership with EDF Renewables.
-
Desert Harvest 1 and Desert Harvest 2 PV projects
The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.
-
Coyote Onshore Wind Farm
The 243 MW Coyote wind project is part of Masdar’s second strategic EDF investment in Scurry County, Texas and features (48) 4.5 MW and (11) 2.4 MW Siemens Gamesa turbines.
-
Big Beau
Big Beau is a 164 MWdc solar PV and 40 MW/160 MWh battery energy-storage system. Located in Kern County, California. The project features more than 443 thousand Bifacial Canadian Solar panels with power electronics inverters on ATI trackers.