You Searched for
-
Waste-to-Energy
With the development of waste-to-energy projects, Masdar is helping to tackle the issue of waste management.
-
Offshore Wind
Towering above the waves, offshore wind turbines capture high wind speeds to deliver clean energy.
-
Garadagh Area 60 Solar Photovoltaic Power Plant
The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.
-
Al Wadi Al Jadeed Solar PV Plants
In support of government efforts to unlock the agricultural potential of the Al Wadi Al Jadeed Governorate, Masdar worked closely with Egyptian authorities to identify three sites in the governorate for new solar power plants
-
Jizzakh Solar Project
In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan
-
Ile de Romainville Solar Park
Romainville Solar Park is a 5-megawatt (MW) solar photovoltaic (PV) power plant with battery storage in the Re¬public of Seychelles.
-
Solomon Islands Solar PV Plant
The one megawatt plant, which was expanded from 600kW following a grant from the New Zealand Ministry of Foreign Affairs and Trade, bolster energy resilience and reduce costs associated with diesel imports
-
Welkin Road Stockport
The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.
-
Royle Barn Road Rochdale
The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.
-
Bilasuvar Solar Power Plant
The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Neftchala Solar Power Plant
The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Sherabad Solar Project
In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.
-
Taiba
The 158.7MW Parc Eolien Taiba N’Diaye (PETN) provides power for over 2 million people.
-
Vanuatu Port Vila 767kW Solar PV
Port Vila, the capital city of the island state of Vanuatu, has a population of 44,000, of which only 27% have access to electricity
-
Suriname Solar-PV Hybrid
This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.
-
Siwa Solar PV Plant
Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.
-
Nauru Solar
The Republic of Nauru is an island of just 21 square kilometres with more than 9,500 citizens that is highly dependent on imported fossil fuels for transport and power generation
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company
-
Maverick 1 and Maverick 4 PV projects
The project comprises of two solar PV plants with a total capacity of 311 MW located in Riverside County, California. Together, the projects feature 780 thousand Bifacial Canadian Solar panels with SMA inverters on NexTracker single axis trackers upgraded with TrueCapture Software, guaranteed to increase project output.
-
Desert Harvest 1 and Desert Harvest 2 PV projects
The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.