You Searched for

We’ve found 1315 results
  • Jordan’s King Abdullah II Inaugurates First Utility-Scale Wind Farm in the Middle East

    Tafila, Jordan, 17 December, 2015 – His Majesty King Abdullah II Ibn al-Hussein of the Hashemite Kingdom of Jordan inaugurated today the first utility-scale wind power project in the Middle East with high-level officials from across the Middle East in attendance, including HRH Prince Talal bin Muhammad; HE Dr Abdullah Ensour, the Prime Minister of Jordan; HE Dr Sultan Al Jaber, UAE Minister of State and Chairman of Masdar; HE Dr Ibrahim Saif, Jordan Minister of Energy and Mineral Resources; HE Bilal Rabie Bilal Al Bodour, UAE Ambassador to Jordan; and Dr Ahmad Belhoul, CEO of Masdar. Built by the Jordan Wind Project Company (JWPC), the wind farm is a joint project of Masdar, InfraMed and EP Global Energy.

    Published on: 19 DEC 2015

  • Arab Women’s Role in Energy and Climate Change Highlighted on Sidelines of World Economic Forum in t

    The high-level majlis titled “Arab women leading the way in energy and climate change” was jointly hosted by the Directorate of Energy and Climate Change at the UAE Ministry of Foreign Affairs, the Mary Robinson Foundation - Climate Justice and Masdar, Abu Dhabi’s renewable energy company.

    Published on: 12 NOV 2012

  • UAE puts energy-water-food-climate nexus on UN agenda at ongoing climate negotiations

    The United Arab Emirates today hosts COP18’s central discussion of the energy-water-food-climate nexus, in cooperation with New York University. The panel, “It Never Rains in the GCC,” had identified priority government interventions in the market to manage the nexus as its global significance intensities. Held as part of the UNFCCC climate change negotiations in Doha and moderated by Chatham House, the panel brings together experts from the OECD, World Economic Forum, Global Water Partnership, Qatar Foundation, Environment Agency Abu Dhabi, New York University, and UN Food and Agriculture Organization.

    Published on: 07 DEC 2012

  • Abu Dhabi to Host First Energy Ministerial Meeting of the South American-Arab League

    The ministerial conference is an outgrowth of the ASPA Summits of Heads of State and Government in Doha in 2009 and Lima in 2012. The summits identified energy as the backbone for Arab and South American dialogue and collaboration.

    Published on: 21 DEC 2012

  • Masdar And Terna Energy

  • Photovoltaic Power

    Blessed with abundant sunshine the UAE has made the most of solar power. Since 2006, Masdar has pioneered life-changing utility-scale and off-grid solar projects around the world.

  • Concentrated Solar Power

    Concentrated Solar Power (CSP) systems are considered a promising technology for large-scale power generation. Masdar has invested in and developed several different types of CSP projects.

  • Waste-to-Energy

    With the development of waste-to-energy projects, Masdar is helping to tackle the issue of waste management.

  • Offshore Wind

    Towering above the waves, offshore wind turbines capture high wind speeds to deliver clean energy.

  • Onshore Wind

    Turbines rooted in land capture this mighty clean energy source to power homes and businesses.

  • Pertamina Geothermal Energy

    Masdar entered the geothermal market in February 2023 by investing in one of the world’s largest geothermal players, Pertamina Geothermal Energy. The geothermal plants generate 4.8TWh geothermal energy with 3,915,000 tons of carbnon dioxide avoided each year.

  • Guzar

    Masdar has entered into a Public Private Partnership Agreement to design, build and operate a 300MW solar photovoltaic power plant and 75MWh capacity battery energy storage system in the Kashkadarya Region in the Republic of Uzbekistan. Financial close was reached during Abu Dhabi Sustainability Week 2026.

  • Garadagh Area 60 Solar Photovoltaic Power Plant

    The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.

  • Al Wadi Al Jadeed Solar PV Plants

    In support of government efforts to unlock the agricultural potential of the Al Wadi Al Jadeed Governorate, Masdar worked closely with Egyptian authorities to identify three sites in the governorate for new solar power plants

  • Jizzakh Solar Project

    In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan

  • Fiji LaKaRo 525kW Solar PV

    Inhabitants on three of Fiji’s outer islands (Kadevu, Lakeba, and Rotuma) have access to energy around the clock having previously had power for only 12-18 hours a day

  • Welkin Road Stockport

    The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.

  • Royle Barn Road Rochdale

    The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.

  • Bilasuvar Solar Power Plant

    The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.

  • Neftchala Solar Power Plant

    The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.