  • Floating Photovoltaic Solar Power

    Locating solar power plants on water is an innovative alternative for countries seeking to harness the power of the sun.

  • Concentrated Solar Power

    Concentrated Solar Power (CSP) systems are considered a promising technology for large-scale power generation. Masdar has invested in and developed several different types of CSP projects.

  • Offshore Wind

    Towering above the waves, offshore wind turbines capture high wind speeds to deliver clean energy.

  • Onshore Wind

    Turbines rooted in land capture this mighty clean energy source to power homes and businesses.

  • Pertamina Geothermal Energy

    Masdar entered the geothermal market in February 2023 by investing in one of the world’s largest geothermal players, Pertamina Geothermal Energy. The geothermal plants generate 4.8TWh geothermal energy with 3,915,000 tons of carbnon dioxide avoided each year.

  • Garadagh Area 60 Solar Photovoltaic Power Plant

    The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.

  • Al Wadi Al Jadeed Solar PV Plants

    In support of government efforts to unlock the agricultural potential of the Al Wadi Al Jadeed Governorate, Masdar worked closely with Egyptian authorities to identify three sites in the governorate for new solar power plants

  • Hywind Scotland

    Hywind is the world’s first floating offshore windfarm, located off the coast of Aberdeenshire in Scotland. Masdar has a 25 per cent stake in the 30MW project, along with lead operator Equinor, which owns 75 per cent.

  • Welkin Road Stockport

    The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.

  • Royle Barn Road Rochdale

    The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.

  • Neftchala Solar Power Plant

    The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.

  • Samoa Wind Farm

    The innovative project supploes 1,500 megawatt-hours of power per year, delivering $475,000 (U.S.) in annual fuel savings

  • Taiba BESS

    The key applications of the project are grid stabilization, frequency regulation and reactive power support.

  • Maverick 1 and Maverick 4 PV projects

    The project comprises of two solar PV plants with a total capacity of 311 MW located in Riverside County, California. Together, the projects feature 780 thousand Bifacial Canadian Solar panels with SMA inverters on NexTracker single axis trackers upgraded with TrueCapture Software, guaranteed to increase project output.

  • Big Beau

    Big Beau is a 164 MWdc solar PV and 40 MW/160 MWh battery energy-storage system. Located in Kern County, California. The project features more than 443 thousand Bifacial Canadian Solar panels with power electronics inverters on ATI trackers.

  • Belize 400kW Solar PV Battery

    With 400kW of solar photovoltaic panels, 600kWh of battery storage, and 184kW backup diesel generation, the system will mainly be powered by solar energy, with a standby diesel generator to provide power during the wet season.

  • Nur-Bukhara PV

    In April 2023, Masdar signed a Power Purchase Agreement (PPA) and Government Support Agreement (GSA) with the government of the Republic of Uzbekistan to design, finance, build and operate the Nur Bukhara 250MW solar and 63MW/126MWh battery storage project.

  • Modern Day Slavery Statement

    Masdar continually works to prevent slavery and human trafficking from taking place in our manufacturing supply chains and operations, in line with the United Kingdom Modern Slavery Act.

  • masdaratcop29

    Masdar at COP29: Pioneering renewable energy to the world

  • Azerbaijan

    Masdar partners with the nation to promote renewable energy and sustainability in the South Caucasus.