You Searched for
-
we-are-committed
Published on: 19 JAN 2019
-
Flag day
Published on: 01 NOV 2018
-
New report ranks UAE 42nd in the world for environmental performance
The UAE has climbed 35 places in the biannual Environmental Performance Index (EPI), a sustainability report that evaluates the environmental performance of 180 countries.
Published on: 24 JUN 2020
-
Second Phase of Masdar City’s Etihad Eco-Residence Awarded LEED Platinum Certification
Masdar has announced that the second phase of its Etihad Eco-Residence project has been awarded Platinum certification, the highest ranking under the Leadership in Energy and Environmental Design (LEED) system.
Published on: 26 APR 2020
-
The Zayed Sustainability Prize’s 20by2020 Humanitarian Initiative Rebranded to Beyond2020 for Continuous Global Outreach
Following the widespread success of the 20by2020 initiative in helping deliver vital sustainable solutions to vulnerable communities around the world, the Zayed Sustainability Prize has announced the transformation of the 20by2020 initiative into Beyond2020, establishing it as a flagship platform of the Prize for continuous global outreach.
Published on: 17 MAR 2021
-
Global experts deliberate on 2018 Zayed Future Energy Prize entries
The evaluation process of the 2018 Zayed Future Energy Prize entries, the UAE’s international awards for renewable energy and sustainability, kick-started with a two-day meeting of the Review Committee in Abu Dhabi.
Published on: 25 SEP 2017
-
Flag Day
Published on: 03 NOV 2022
-
Flag Day 2023
Published on: 03 NOV 2023
-
First Large Scale Wind Farm Project in Seychelles Inaugurated
Envisioned by His Highness Sheikh Khalifa bin Zayed bin Sultan Al Nahyan, President of the UAE, Supreme Commander of the UAE Armed Forces and Ruler of Abu Dhabi, and President James Alix Michel, the wind farm project is the first major renewable energy project in the Seychelles and will constitute 11% installed capacity of electricity on the main island, which will cut down on fossil fuel import and reduce greenhouse gas emission.
Published on: 29 FEB 2012
-
Masdar Green Real Estate Investment Fund signs a green financing agreement with First Abu Dhabi Bank
Published on: 19 JAN 2022
-
Youth from Across UAE Join The Student Exclusive
The Student Exclusive – a first-of-its-kind youth event at Abu Dhabi Sustainability Week (ADSW) – drew hundreds of students from across the United Arab Emirates for the January 19 event. Supporting ADSW’s mission of raising awareness about sustainable development across the Emirates, the event represented an important gathering of students on sustainability in the UAE, as part of the Middle East’s largest conference on sustainability.
Published on: 20 JAN 2016
-
Renewables
We are active in solar, wind, waste-to-energy, geothermal, energy storage and green hydrogen projects across the world with a generation capacity of over 20 gigawatts, equivalent to displacing 30 million tonnes of carbon dioxide per year.
-
Pertamina Geothermal Energy
Masdar entered the geothermal market in February 2023 by investing in one of the world’s largest geothermal players, Pertamina Geothermal Energy. The geothermal plants generate 4.8TWh geothermal energy with 3,915,000 tons of carbnon dioxide avoided each year.
-
Fiji LaKaRo 525kW Solar PV
Inhabitants on three of Fiji’s outer islands (Kadevu, Lakeba, and Rotuma) have access to energy around the clock having previously had power for only 12-18 hours a day
-
Kangnas
Situated approximately 52km east of the town of Springbok in the Nama Khoi Local Municipality of the Northern Cape
-
West Bakr
Lekela’s West Bakr Wind project in the Gulf of Suez takes advantage of a world class wind resource to produce 252MW of clean, reliable power at a highly competitive price.
-
Vanuatu Port Vila 767kW Solar PV
Port Vila, the capital city of the island state of Vanuatu, has a population of 44,000, of which only 27% have access to electricity
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company
-
Taiba BESS
The key applications of the project are grid stabilization, frequency regulation and reactive power support.
-
Perderkraal East
Perdekraal East is a 110 MW wind farm located approximately 30km north of Touwsriver in Western Cape, South Africa.