You Searched for
-
Masdar And Terna Energy
-
World Future Energy Summit
Masdar to host the second annual Green Hydrogen Summit, as part of the World Future Energy Summit, aims to accelerate the development of the global green hydrogen economy to support the energy transition.
-
Waste-to-Energy
With the development of waste-to-energy projects, Masdar is helping to tackle the issue of waste management.
-
Energy storage
Masdar is committed to developing and deploying energy storage solutions to create a more flexible grid system.
-
DBS Dogger Bank South
Located 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector.
-
Project Chereh
In December 2025, Masdar signed a power purchase agreement (PPA) with Tenaga Nasional Berhad (TNB), Malaysia’s national utility, to develop the region’s largest floating solar photovoltaic (PV) power plant at the Chereh Dam in Pahang State, marking Masdar’s inaugural project in Malaysia.
-
Garadagh Area 60 Solar Photovoltaic Power Plant
The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.
-
Jizzakh Solar Project
In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan
-
Cirata Floating Photovoltaic FPV Plant
In January 2020, Masdar signed a power purchase agreement (PPA) with PT PLN Nusantara Renewables, a subsidiary of PT Perusahaan Listrik Negara (Persero) (PLN), the state-owned electricity company in Indonesia. The agreement was to build Southeast Asia’s largest floating solar power plant.
-
Bilasuvar Solar Power Plant
The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Neftchala Solar Power Plant
The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Sherabad Solar Project
In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.
-
Vanuatu Port Vila 767kW Solar PV
Port Vila, the capital city of the island state of Vanuatu, has a population of 44,000, of which only 27% have access to electricity
-
Siwa Solar PV Plant
Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company
-
Perderkraal East
Perdekraal East is a 110 MW wind farm located approximately 30km north of Touwsriver in Western Cape, South Africa.
-
Khobab
The Khobab Wind Farm was contracted under the South African Government’s Round 3 Renewable Energy Independent Power Producer Procurement Programme, achieving commercial operation in December 2017.
-
Desert Harvest 1 and Desert Harvest 2 PV projects
The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.
-
Big Beau
Big Beau is a 164 MWdc solar PV and 40 MW/160 MWh battery energy-storage system. Located in Kern County, California. The project features more than 443 thousand Bifacial Canadian Solar panels with power electronics inverters on ATI trackers.
-
Code of Ethics and Business Conduct
Our Code of Ethics & Business Conduct (Code) is the essential guide that defines what we stand for and how we work. It emphasizes that we must keep integrity at the heart of everything we do.