You Searched for

We’ve found 1314 results
  • Masdar Honoured as the First Recipient of the ‘Leadership in New Energy’ Award

    The award was presented in London at a conference held by Energy Intelligence and the International Herald Tribune. Accepting the award, Dr. Sultan Ahmed Al Jaber, chief executive officer of Masdar, underscored the company’s critical role in accelerating the widespread adoption of renewable energy.

    Published on: 16 NOV 2012

  • UAE puts energy-water-food-climate nexus on UN agenda at ongoing climate negotiations

    The United Arab Emirates today hosts COP18’s central discussion of the energy-water-food-climate nexus, in cooperation with New York University. The panel, “It Never Rains in the GCC,” had identified priority government interventions in the market to manage the nexus as its global significance intensities. Held as part of the UNFCCC climate change negotiations in Doha and moderated by Chatham House, the panel brings together experts from the OECD, World Economic Forum, Global Water Partnership, Qatar Foundation, Environment Agency Abu Dhabi, New York University, and UN Food and Agriculture Organization.

    Published on: 07 DEC 2012

  • Abu Dhabi to Host First Energy Ministerial Meeting of the South American-Arab League

    The ministerial conference is an outgrowth of the ASPA Summits of Heads of State and Government in Doha in 2009 and Lima in 2012. The summits identified energy as the backbone for Arab and South American dialogue and collaboration.

    Published on: 21 DEC 2012

  • Prime Minister David Cameron inaugurates world’s largest offshore wind farm

    London Array, the 630MW offshore wind farm located in the Outer Thames Estuary, first started generating power in October 2012. The 175th turbine was bought online in March 2013 and London Array is now celebrating the completion and full operation of the site, which could supply around 500,000 UK homes with electricity each year.

    Published on: 03 JUL 2013

  • Masdar And Terna Energy

  • Floating Photovoltaic Solar Power

    Locating solar power plants on water is an innovative alternative for countries seeking to harness the power of the sun.

  • Photovoltaic Power

    Blessed with abundant sunshine the UAE has made the most of solar power. Since 2006, Masdar has pioneered life-changing utility-scale and off-grid solar projects around the world.

  • Concentrated Solar Power

    Concentrated Solar Power (CSP) systems are considered a promising technology for large-scale power generation. Masdar has invested in and developed several different types of CSP projects.

  • Waste-to-Energy

    With the development of waste-to-energy projects, Masdar is helping to tackle the issue of waste management.

  • Offshore Wind

    Towering above the waves, offshore wind turbines capture high wind speeds to deliver clean energy.

  • Onshore Wind

    Turbines rooted in land capture this mighty clean energy source to power homes and businesses.

  • Garadagh Area 60 Solar Photovoltaic Power Plant

    The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.

  • Al Wadi Al Jadeed Solar PV Plants

    In support of government efforts to unlock the agricultural potential of the Al Wadi Al Jadeed Governorate, Masdar worked closely with Egyptian authorities to identify three sites in the governorate for new solar power plants

  • Jizzakh Solar Project

    In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan

  • Welkin Road Stockport

    The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.

  • Royle Barn Road Rochdale

    The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.

  • Bilasuvar Solar Power Plant

    The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.

  • Neftchala Solar Power Plant

    The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.

  • Sherabad Solar Project

    In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.

  • Vanuatu Port Vila 767kW Solar PV

    Port Vila, the capital city of the island state of Vanuatu, has a population of 44,000, of which only 27% have access to electricity