You Searched for

We’ve found 1315 results
  • Jordan’s King Abdullah II Inaugurates First Utility-Scale Wind Farm in the Middle East

    Tafila, Jordan, 17 December, 2015 – His Majesty King Abdullah II Ibn al-Hussein of the Hashemite Kingdom of Jordan inaugurated today the first utility-scale wind power project in the Middle East with high-level officials from across the Middle East in attendance, including HRH Prince Talal bin Muhammad; HE Dr Abdullah Ensour, the Prime Minister of Jordan; HE Dr Sultan Al Jaber, UAE Minister of State and Chairman of Masdar; HE Dr Ibrahim Saif, Jordan Minister of Energy and Mineral Resources; HE Bilal Rabie Bilal Al Bodour, UAE Ambassador to Jordan; and Dr Ahmad Belhoul, CEO of Masdar. Built by the Jordan Wind Project Company (JWPC), the wind farm is a joint project of Masdar, InfraMed and EP Global Energy.

    Published on: 19 DEC 2015

  • Photovoltaic Power

    Blessed with abundant sunshine the UAE has made the most of solar power. Since 2006, Masdar has pioneered life-changing utility-scale and off-grid solar projects around the world.

  • Offshore Wind

    Towering above the waves, offshore wind turbines capture high wind speeds to deliver clean energy.

  • DBS Dogger Bank South

    Located 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector.

  • Guzar

    Masdar has entered into a Public Private Partnership Agreement to design, build and operate a 300MW solar photovoltaic power plant and 75MWh capacity battery energy storage system in the Kashkadarya Region in the Republic of Uzbekistan. Financial close was reached during Abu Dhabi Sustainability Week 2026.

  • Garadagh Area 60 Solar Photovoltaic Power Plant

    The 230-megawatt (MWac) Garadagh (Area 60) Solar PV Plant is the country’s first foreign investment-based independent utility scale solar project structured as a public-private partnership.

  • 100 MW Nur Navoi Solar Project

    In November 2019, Masdar signed a Power Purchase Agreement (PPA) and Government Support Agreement (GSA) with the Government of the Republic of Uzbekistan to design, finance, build and operate the country’s first public-private partnership (PPP) solar power plant.

  • Dudgeon Offshore Wind Farm

    Located 32 kilometres off the coast of North Norfolk, in East Anglia, Dudgeon is one of Masdar’s current investments in the UK’s renewable energy sector.

  • Loeriesfontein 2

    Loeriesfontein 2 is situated in the Hantam Municipality of South Africa’s Northern Cape and was contracted under the third round of the country’s Renewable Energy Independent Power Producer Procurement Programme.

  • Kangnas

    Situated approximately 52km east of the town of Springbok in the Nama Khoi Local Municipality of the Northern Cape

  • Suriname Solar-PV Hybrid

    This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.

  • Perderkraal East

    Perdekraal East is a 110 MW wind farm located approximately 30km north of Touwsriver in Western Cape, South Africa.

  • Belize 400kW Solar PV Battery

    With 400kW of solar photovoltaic panels, 600kWh of battery storage, and 184kW backup diesel generation, the system will mainly be powered by solar energy, with a standby diesel generator to provide power during the wet season.

  • Afghanistan Solar Home Systems

    Masdar installed solar home systems in more than two dozen villages around Camp Robinson within the Helmand Province of southern Afghanistan.

  • Dudgeon Extension

    Located 27 kilometres off the coast of North Norfolk in East Anglia within water depths of between 18 and 25 metres, the Dudgeon Extension Offshore Wind Farm is one of Masdar's latest investments in the United Kingdom’s renewable energy sector.

  • Morocco

    Masdar contributes to a sustainable and renewable energy future in North Africa.

  • IAmWiSER

    This global campaign encouraged policymakers, industry leaders and the public to take the #IAmWiSER pledge to champion women as agents of sustainable change. The campaign was launched in October 2022 with the endorsement of women globally recognized for leading sustainability at the highest levels of UAE government, multinational corporations, and the United Nations.

  • Hamad Almenhali

    Executive Director, Internal Audit

  • Mazin Khan

    As Chief Financial Officer of Masdar, Mazin Khan brings over 20 years of invaluable experience in the utilities and renewable energy sectors.

  • WiSER outlines 10 actions to expand women’s economic participation and drive global growth

    WiSER, a global platform founded by Masdar and the Zayed Sustainability Prize to champion women as leaders of sustainable change, today launched Inclusive Pathways for Transformative Growth, a white paper that recommends practical actions to enhance women’s economic participation and drive global growth.

    Published on: 09 APR 2026