Al Wadi Al Jadeed Solar PV Plants
In support of government efforts to unlock the agricultural potential of the Al Wadi Al Jadeed Governorate, Masdar worked closely with Egyptian authorities to identify three sites in the governorate for new solar power plants
-
Jizzakh Solar Project
In July 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 220-megawatt (MW) utility-scale solar PV project in the Djizzakh Region of Uzbekistan
-
Fiji LaKaRo 525kW Solar PV
Inhabitants on three of Fiji’s outer islands (Kadevu, Lakeba, and Rotuma) have access to energy around the clock having previously had power for only 12-18 hours a day
-
Welkin Road Stockport
The Welkin Road battery energy storage system (BESS) plant is situated in Stockport on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 20MW/40Mwh plant will power 10,000 homes per day based upon two cycles per day. It is expected to become operational in Q2 2025.
-
Royle Barn Road Rochdale
The Royle Barn Road battery energy storage system (BESS) plant is situated in Rochdale on a previously industrialized site, conforming to Masdar Arlington Energy’s strategy to house projects on land in need of redevelopment and regeneration. The 35MW/70Mwh plant will power 15,900 homes per day based upon two cycles per day. It is expected to become operational in Q2 2027.
-
Bilasuvar Solar Power Plant
The Investment agreement for the 445MW Bilasuvar Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Neftchala Solar Power Plant
The Investment agreement for the 315MW Neftchala Solar project was reached in October 2023, followed by the signing of Power Purchase Agreements, Transmission Connection Agreements, and Land Lease Agreements.
-
Sherabad Solar Project
In August 2021, Masdar signed an agreement with the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan and JSC National Electric Grid of Uzbekistan to design, finance, build and operate a 457-megawatt (MW) utility-scale solar PV project in the Surkhandarya Region of Uzbekistan. This project reached full capacity in 2024, with commercial operation expected to commence in 2026.
-
West Bakr
Lekela’s West Bakr Wind project in the Gulf of Suez takes advantage of a world class wind resource to produce 252MW of clean, reliable power at a highly competitive price.
-
Suriname Solar-PV Hybrid
This 1.2MWp Solar Power Plant is located at Anton de Kom University of Suriname Campus, also including 576kWh BESS for energy shifting, peak shaving, output stabilisation and education purposes. The Solar+BESS will be used for Renewable Energy Education courses in the faculty of Engineering.
-
Siwa Solar PV Plant
Masdar’s 10 megawatt solar photovoltaic (PV) power plant in Siwa was the largest solar power installation in Egypt at the time of its completion in March 2015. The project is the first utility-scale solar power installation in the Arab Republic of Egypt and accounts for 30% of the grid capacity of Siwa City and its adjoining areas.
-
Toshka
The Toshka Solar Power Plant located in Egypt provides power for the large-scale operations of an agriculture company
-
Maverick 1 and Maverick 4 PV projects
The project comprises of two solar PV plants with a total capacity of 311 MW located in Riverside County, California. Together, the projects feature 780 thousand Bifacial Canadian Solar panels with SMA inverters on NexTracker single axis trackers upgraded with TrueCapture Software, guaranteed to increase project output.
-
Desert Harvest 1 and Desert Harvest 2 PV projects
The Desert Harvest 1 and Desert Harvest 2 PV projects, which total 217 MWdc of solar, started commercial operation in December 2020. The projects are located in Riverside County, California.
-
Big Beau
Big Beau is a 164 MWdc solar PV and 40 MW/160 MWh battery energy-storage system. Located in Kern County, California. The project features more than 443 thousand Bifacial Canadian Solar panels with power electronics inverters on ATI trackers.
-
Privacy Policy
Abu Dhabi Future Energy Company PJSC - Masdar (“Masdar”, “us” or “we”) acknowledges and respects your right to privacy and is committed to protecting and safeguarding your data that we use in compliance with applicable data protection laws.
-
Code of Ethics and Business Conduct
Our Code of Ethics & Business Conduct (Code) is the essential guide that defines what we stand for and how we work. It emphasizes that we must keep integrity at the heart of everything we do.
-
Fraud Warning
Abu Dhabi Future Energy Company PJSC – Masdar (“Masdar”), is advising that it has become aware of a notable increase in fraudulent emails, letters, social media posts, and messages via online messaging services, being sent to members of the public.
-
Our Company
Masdar develops utility-scale power plants, community grid projects, and energy storage, efficiency-focused systems, and technology demonstration projects.
-
Awards and Recognition
Masdar has been recognised by a wide number of industry awards for its buildings, projects and innovations